Key Specifications

Key Attributes

1. Suitable for lotion pumps of various standard sizes.
2. Various components of the lotion pump can be customized.
3. The pump core can be tested independently using inspection equipment.
4. Fully compatible with automated lotion pump assembly machines.

SR-LPC-02 1.6-1.8cc Lotion Pump Core

Commissioning workflow

Product assembly line solutions

View custom service

Select products and customize assembly lines accordingly.

Provide production capacity requirements and design assembly line workstations.

Additional testing functions need to be confirmed in advance.

Provide assembly line quotation, drawings, and production capacity.

Confirm the assembly line solution

Provide products for designing and manufacturing assembly line components.

Assemble components

Assembly line tryout & identify problems & make improvements.

Retest till machine running stable

Machine inspection by customer

Wooden packing and shipment

After-sales support, remote diagnosis, and spare parts coordination.

Manufacturing powerhouse

Manufacturing Powerhouse

Songrock integrates mold design, injection molding, component assembly, automatic machinery manufacturing, quality checks, and export coordination inside one production campus.

28km2 production campus
90+injection molding systems
100+Assembly Machines

Factory workshop views

See the production environment behind this product system

Real workshop images help procurement teams review manufacturing depth before arranging a live video inspection or factory visit.

Mold & tooling workshop
01

Mold & tooling workshop

Precision tooling review, machining coordination, and mold trials before mass production.

Automatic assembly floor
02

Automatic assembly floor

Custom feeding, pressing, testing, and line adjustment with real customer components.

Product showroom review
03

Product showroom review

Sprayers, pumps, caps, droppers, and components can be checked as a connected product system.

One-stop solution

Machine, mold, molded parts, and testing coordinated by one engineering team

Songrock connects product structure review, mold design, injection molding, automated assembly, quality inspection, and export handover so buyers can reduce supplier coordination risk.

Get Free Solution
01Product samples and CAD audit
02Mold and component development
03Injection molding and assembly verification
04Factory Acceptance Test, documentation, packing, and export

Global compliance

Verified and approved by world-class authorities

Our manufacturing workflows, management operations, and finished packaging projects comply with major international trade regulations and industrial compliance clearances.

Exhibition stories

Global buyer conversations beyond the factory floor

View custom case
Asia packaging machinery exchange
Trade show

Asia packaging machinery exchange

Live buyer discussions around trigger sprayer assembly, mold matching, and output planning.

Global daily chemical packaging fair
Trade show

Global daily chemical packaging fair

Songrock shared one-stop project cases with brand owners and procurement teams.

Factory-backed engineering meetings
Trade show

Factory-backed engineering meetings

Exhibition inquiries are converted into sample review, technical layout, and Factory Acceptance Test planning.

Technical FAQ

Technical Frequently Asked Questions

What is your primary automation assembly machinery and injection mold focus?

We custom-engineer high-efficiency automated assembly lines and matching injection mold tools for multi-part daily chemical closures including trigger sprayers, lotion pumps, mist sprayers, mini triggers, foam pumps, plastic caps, and plastic droppers.

What are your capabilities regarding new product research and development?

Songrock operates an expert-led industrial development and mechanical design department that creates custom machinery layouts and tool geometries around capacity targets and product requests.

How do you handle machine testing and quality inspections?

We run custom tooling on in-house injection molding machinery, transfer freshly molded components onto the automated assembly line, and verify machine-part matching before shipment.

What is the typical production and delivery lead time?

The standard production cycle is about 3 months from technical sign-off, with exact timing depending on project complexity and factory schedule.